BUS375 Project Management

Quiz 3

Question 1 Including
the change control system within the ________ is a key to a successful project.

Question 2 The
chances of a risk event occurring as a project proceeds through its life cycle
tend to

Question 3 Adopting
proven technology instead of experimental technology in order to eliminate
technical failure would be an example of which risk response?

Question 4 Purchasing
an accident insurance policy would be an example of responding to a risk by
________ it.

Question 5 This
response allocates some or all of the responsibility of realizing the
identified Opportunity for the project.

Question 6 The
risk associated with the unlikelihood that one of the key members will be
struck by lightning would most likely be handled by which of the following?

Question 7 The
initial step in the risk management process is to

Question 8 Which
of the following is NOT one of the potential responses to a specific risk
event?

Question 9 Tools
such as a risk assessment form and a risk severity matrix are used to

Question 10
The cost impact of a risk event occurring as a project proceeds through its
life cycle tends to

Question 11
A special truck that George needs on his project has been scheduled on another
project. This is an example of what type of resource constraint?

Question 12
Technical constraints have been carefully considered when developing a project
network. Which of the following is true at this point?

Question 13
In reviewing the status of her project with top management, Shirley was told
that there are only two programmers that she can use for her project. Her
project is classified as ________ constrained.

Question 14
Most of the scheduling methods available today require the project manager to
classify the project as either ________ constrained or ________ constrained.

Question 15
While balancing assignments, a project manager must also balance:

Question 16
When there are not enough people, money, and/or equipment available for a
project it is known as being

Question 17
In a resource-constrained project, which of the following is most likely to be
changed?

Question 18
All of the following are benefits of scheduling resources before project
implementation EXCEPT

Question 19
Susan is to conduct environmental testing but the chamber cannot hold all the
equipment that she wants to test. This is an example of a constraint that could
impact the sequence and timing of activities in a project network. What type of
constraint is it?

Question 20
All of the following are types of resource constraints EXCEPT

Question 21
Cost slope can be determined by dividing the

Question 22
Reducing project duration

Question 23
Before crashing, direct costs for an activity represent normal costs, which
typically mean low-cost, efficient methods for completing the activity in a(n)
________ amount of time.

Question 24
As a project is crashed and project duration is reduced, indirect costs
typically

Question 25
Which of the following is NOT considered a project indirect cost?

Question 26
All of the following are disadvantages of scheduling overtime EXCEPT

Question 27
In selecting the best activity to crash you would first select the activity
with the

Question 28
The relationship between the normal point and the crash point is assumed to be

Question 29
Without any formal planning, the president of a software company remarks in a
speech that new technologically advanced software will be available in one
year. This may lead to a project that must be done faster than anticipated.
This is an example of reducing project duration caused by

Question 30
The direct cost for completing an activity in the shortest time it can
realistically be completed in is called its ________ cost.