GSCM206 Week 7 Quiz Latest 2019 January Question # 00598758 Subject: Education Due on: 03/02/2019 Posted On: 03/02/2019 01:51 PM Tutorials: 1 Rating: 4.6/5
GSCM206
Managing Operations Across the Supply Chain
Week 7 Quiz
Question 1
(TCO 3) Which one of the following is not a JIT quality
tactic?
Use of statistical
process control
Empowered employees
Fail safe methods
Provide immediate
feedback
Use large lot sizes
Question 2
(TCO 3) Manufacturing cycle time is best defined as the
time between the
arrival of raw materials and the shipping of finished products.
time it takes a unit
to move from one workstation to the next.
time between the
start of one unit and the start of the next unit.
time from raw
materials shipment to finished product exit.
Question 3
(TCO 3) Which of the following is a goal of JIT
partnerships?
Reduce inventory and
variability
Increase variability
Increase in-transit
inventory
Elimination of
engineering changes
Question 4
(TCO 3) Just-in-time systems make demands on layouts, except
distance reduction.
decreased
flexibility.
reduced space and
inventory.
All of the
above
Question 5
(TCO 3) Level schedules
require that
schedules be met with variation.
process many small batches
rather than one large one.
are known as kidney
bean scheduling.
All of the above
Question 6
(TCO 3) Which of the following is specifically characterized
by continuous and forced problem solving through a focus on throughput and
reduced inventory?
Just-in-time (JIT)
Toyota Production
System (TPS)
Lean operations
Material
requirements planning (MRP)
Kanban
Question 7
(TCO 3) What does TPS stand for?
Total production
streamlining
Toyota Production
System
Taguchi’s Production
Ss
Total process
simplification
None of the above
Question 8
(TCO 3) Manufacturing cycle time is best defined as the
length of the work
shift expressed in minutes per day.
time it takes a unit
to move from one workstation to the next.
time between the start
of one unit and the start of the next unit.
sum of all the task
times to make one unit of a product.
time from raw
materials receipt to finished product exit.
Question 9
(TCO 3) Throughput measures the time
that it takes to
process one unit at a station.
between the arrival
of raw materials and the shipping of finished products.
to produce one whole
product through an empty system (i.e., with no waiting).
required to move
orders through the production process, from receipt to delivery.
None of the above
Question 10
(TCO 3) The list of 5 Ss, although it looks like a
housekeeping directive, supports lean production by
identifying nonvalue
items and removing them in the sort/segregate item.
reducing inventory
in the standardize item.
increasing
variability through standardized procedures in the standardize item.
eliminating wasted
motion through ergonomic studies in the support item.
building good safety
practices in the shine/sweep item.