COSC4337 Group Project – Project Report of Operating Systems
Project Report of Operating Systems
Project title: Project sample
Project number: Group project 1
Course number: COSC 4337
Student’s name: Qi Zhu& Qi Zhu
Date handed in: 8/10/2021
Table of Content
1. Problem Statement
2. Project Analysis
3. Design & Class Prototype
4. Testing and sample results
5. Conclusion
Problem Statement
Specifying the problem requirements forces you to state the problem clearly and unambiguously to gain a precise understanding of what is required for its solution. Your objective is to eliminate unimportant aspects and zero in on the root problem. This goal may not be as easy to achieve as it sounds. You may, for instance, need more information from the person who posed the problem. .
Analysis
Analyzing the problem involves identifying the problem inputs (the data you have to work with), outputs (the desired results), and any additional requirements for or constraints on the solution. At this stage, you should also determine the format in which the results should be displayed and develop a list of problem variables and their relationships. These relationships may be expressed as formulas.
Design &Class Prototype
Designing the algorithm to solve the problem requires you to develop a list of steps (an algorithm) to solve the problem and then verify that the algorithm solves the problem as intended. Writing the algorithm is often the hardest part of the problem-solving process, you could use the pseudo-codes or diagrams to describe it. The old proverb that a picture is worth ten thousand words is often true. Design information, in particular, can frequently be conveyed much more effectively with drawings or charts than with words alone.
Class prototype is the contract of a class, as an outline class declaration showing only public fields and the heading of the constructor and methods. Display the class prototype and also show the relationship between different classes.
Testing
Testing and verifying the program requires some testing cases to verify the completed program working as desired. Don’t rely on just one test case; run the program several times using different sets of data, making sure that it works correctly for every situation provided for in the algorithm.
Take the screen shots of your results and paste in your report, make sure that it is a correct one.
Conclusion
Concluding your project gives a few sentences to conclude your project. If it is an unsuccessful one, then what is the reason why you failed?

Having Trouble Meeting Your Deadline?
Get your assignment on COSC4337 Group Project – Project Report of Operating Systems completed on time. avoid delay and – ORDER NOW